Kwando Kwara Camp – Project by Nature Zone
Kwando Kwara Camp – Project by Nature Zone
Okavanga Delta
- Commercial Off Grid installed in July 2019
- 100 Kw ATESS Hybrid 3 phase Battery PV Inverter with 300 Kwh High Voltage Freedom Won Battery.
- This system was designed and installed by Nature Zone Botswana, Widowbird
- Solar Solutions and Freedom Won built the battery on site and assisted with final commissioning.